Invisible grill installation done in a set order: measure, fix the frame, seal it to the wall, then fit and tension the SS316 cable. See exactly what happens at your home.

The same careful order of work, whether it is one balcony or a whole tower.
Invisible grill installation looks quick when it is done well, because the finished result is so light. Behind that simplicity there are decisions that decide how the grill ages: where the fixings go, how the frame meets the wall, how the cable is tensioned and how the joint is sealed.
This page walks through what happens from your first call to the handover, what we need from you, and what you should expect from any installer. If anything differs from what you have been told elsewhere, you will know what to ask.
We also explain the part that is hidden once the work is finished, which is the sealing of the frame to the wall. It is the step that is most often skipped, and it matters most in Hyderabad’s monsoon.
We follow this order on every job.
We measure every opening, check the wall and mark the fixing points before anything is drilled. This is where the layout and cable spacing are agreed with you.
The anodised aluminium track is fixed to the wall at the marked points, at the top and bottom of each opening.
The joint between the frame and the wall is sealed with ROOFEXSEAL PU 212, closing the gap that rainwater would follow behind the track.
SS316 cable is run through the track and tensioned evenly across the opening, then every cable is checked.
We use Armstrong ROOFEXSEAL PU 212, made by Armstrong Chemicals, along the joint between every frame and the wall.
Nothing is drilled until the layout is agreed.
A trained expert visits your home, looks at each opening and checks the wall. We ask who uses the balcony, because that decides the cable spacing, and we point out anything that affects the fitting, such as the edge condition or an uneven wall.
You leave the visit knowing the layout, the spacing and what the invoice will state. The visit is free and there is no obligation to go ahead.
A little preparation makes the fitting cleaner.
If your society requires approval, we can walk the committee through the method and a sample fitting.
The materials we use, stated plainly.
The steel grade and cable diameter are stated on your invoice.
The terms are set out on a warranty card in plain language.
Sealing adds care and material to every job, and it is hidden once the frame is fitted, which is why it is so often skipped. An unsealed gap between the frame and the wall lets rainwater seep behind the track and into the wall.
We treat sealing as part of invisible grill installation, not an extra. A sealed joint should leave the base of the track dry after heavy rain.

You should leave with proof of what was fitted.
Before we leave, we check the tension of every cable, tidy the area and walk you through the finished work. You receive the warranty card, which sets out in plain language what the 20-year assured warranty covers, and your invoice states the steel grade and the cable diameter.
After the handover, caring for the grill is simple. Wipe the cable with a damp cloth, keep harsh acids and bleach away from the steel, and mask the track if you repaint the wall. If a cable ever feels slack, or the base of the track looks damp, call us and we will check the fitting.

Book a free site visit. We measure, agree the layout and explain each step before any work starts.
Spacing, fitting and the view from your balcony.
How spacing, fixings and tensioning make the difference.
A plain comparison of the options.
Our full guide to materials and warranty.
We measure each opening, mark the fixing points, fix the frame, seal it to the wall, fit the cable and tension it. You then receive a warranty card and an invoice that states the steel grade.
There are four steps in this order: measure and mark, fix the frame, seal it to the wall, then fit and tension the SS316 cable. We follow the same order on every job.
Yes. A trained expert visits for free, measures every opening, checks the wall and agrees the layout and cable spacing with you before any work begins.
Our trained installers carry out the work, with the same order of work for a single balcony or a whole tower.
Fixing the frame requires drilling at the marked points, which is why we check the wall and mark the points first. The joint is then sealed so the wall stays protected from rain.
The gap between the frame and the wall is where rainwater seeps in. We seal it with polyurethane sealant so the wall stays dry. It is hidden once fitted, so it is often skipped elsewhere.
Armstrong ROOFEXSEAL PU 212, a single-component polyurethane sealant that bonds to concrete and masonry without a primer. It is made by Armstrong Chemicals.
Clear access to each opening, furniture moved away from the edge, a society contact if a permission or gate pass is needed, and confirmation of the spacing agreed on the site visit.
Many societies have their own rules, so ask your committee first. We can walk the committee through the sealed method and a sample fitting if it helps them decide.
Yes. The same SS316 cable and anodised track are used for windows and staircases as for balconies, and the layout is agreed on the site visit.
A warranty card that sets out what the 20-year assured warranty covers, and an invoice that states the steel grade and the cable diameter.
Workmanship and the sealing of the frame to the wall, under a 20-year assured warranty. The terms are written in plain language on the warranty card.
Wipe the cable with a damp cloth, keep harsh acids and bleach away from the steel, and mask the track if you repaint the wall. If a cable feels slack, call us.
Yes. We plan a whole tower as one project, and the sealed method is usually what earns a committee’s approval. We can arrange a committee walk-through and a sample unit.
Yes. We work across Hyderabad and Secunderabad. Call or WhatsApp Apex Safety and we will arrange a free site visit at your building.
We visit, measure every opening and agree the layout and spacing before any drilling begins. Leave your details and we will call to arrange a time.
